BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART:20240910T150000Z
DTEND:20240911T030000Z
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:Project: Mill Bay Road Rebuild
DESCRIPTION:Work to include raising & lowering utilities\, milling off the existing asphalt and paving back the roadway. The project will be done in 2-Phases. Each Phase will be completed before the next Phase starts. Starting with Phase 1 - Hemlock Street to Bartell Avenue\n\nWork schedule:\n\n	WORK TO BEGIN TUESDAY\, SEPTEMBER 3 WITH AN ESTIMATED COMPLETION DATE OF SATURDAY\, SEPTEMBER 14\n	Monday through Saturday (occasional Sundays)\n	Approximately 7:00 a.m. until 7:00 p.m.\n	Paving is weather dependent and could extend the end time or date.\n\nVehicle Traffic:\n\n\n	A Pilot Car Operation Will Be In Place\n	Delays Can Be Expected\n	SIDE ROADS WILL BE CLOSED AT THE INTERSECTION WITH MILL BAY\n	Use An Alternate Route When Possible\n	Motorists within the Work Zone\, MUST WAIT FOR PILOT CAR traveling in their direction\n	Please use caution when traveling near the work zone\; watch for signage and flaggers\n\nPedestrians:\n\n\n	Sidewalks will be open through the project
X-ALT-DESC;FMTTYPE=text/html:<span style="font-size:12pt\;">Work to include raising &amp\; lowering utilities\, milling off the existing asphalt and paving back the roadway. The project will be done in 2-Phases. Each Phase will be completed before the next Phase starts.&nbsp\;<strong>S<span style="text-transform:uppercase\;">tarting with Phase 1 -&nbsp\;</span></strong><strong><span style="text-transform:uppercase\;">Hemlock Street to Bartell Avenue</span></strong></span><br />\n<strong><u><span style="font-size:12pt\;">Work schedule:</span></u></strong>\n<ul>\n	<li style="font-size:11pt\;font-family:Calibri\, sans-serif\;color:rgb(34\, 34\, 34)\;"><span style="font-family:times new roman\,serif\;"><span style="font-size:12pt\;">WORK TO BEGIN TUESDAY\, SEPTEMBER 3 WITH AN ESTIMATED COMPLETION DATE OF SATURDAY\, SEPTEMBER 14</span></span></li>\n	<li style="font-size:11pt\;font-family:Calibri\, sans-serif\;color:rgb(34\, 34\, 34)\;"><span style="font-family:times new roman\,serif\;"><span style="font-size:12pt\;">Monday through Saturday (occasional Sundays)</span></span></li>\n	<li style="font-size:11pt\;font-family:Calibri\, sans-serif\;color:rgb(34\, 34\, 34)\;"><span style="font-family:times new roman\,serif\;"><span style="font-size:12pt\;">Approximately 7:00 a.m. until 7:00 p.m.</span></span></li>\n	<li style="font-size:11pt\;font-family:Calibri\, sans-serif\;color:rgb(34\, 34\, 34)\;"><span style="font-family:times new roman\,serif\;"><span style="font-size:12pt\;">Paving is weather dependent and could extend the end time or date.</span></span></li>\n</ul>\n<strong><u><span style="font-size:12pt\;">Vehicle Traffic:</span></u></strong>\n\n<ul>\n	<li style="font-size:11pt\;font-family:Calibri\, sans-serif\;color:rgb(34\, 34\, 34)\;"><span style="font-family:times new roman\,serif\;"><span style="font-size:12pt\;">A Pilot Car Operation Will Be In Place</span></span></li>\n	<li style="font-size:11pt\;font-family:Calibri\, sans-serif\;color:rgb(34\, 34\, 34)\;"><span style="font-family:times new roman\,serif\;"><span style="font-size:12pt\;">Delays Can Be Expected</span></span></li>\n	<li style="font-size:11pt\;font-family:Calibri\, sans-serif\;color:rgb(34\, 34\, 34)\;"><span style="font-family:times new roman\,serif\;"><span style="font-size:12pt\;">SIDE ROADS WILL BE CLOSED AT THE INTERSECTION WITH MILL BAY</span></span></li>\n	<li style="font-size:11pt\;font-family:Calibri\, sans-serif\;color:rgb(34\, 34\, 34)\;"><span style="font-family:times new roman\,serif\;"><span style="font-size:12pt\;">Use An Alternate Route When Possible</span></span></li>\n	<li style="font-size:11pt\;font-family:Calibri\, sans-serif\;color:rgb(34\, 34\, 34)\;"><span style="font-family:times new roman\,serif\;"><span style="font-size:12pt\;">Motorists within the Work Zone\,&nbsp\;<strong><u>MUST WAIT FOR PILOT CAR</u></strong>&nbsp\;traveling in their direction</span></span></li>\n	<li style="font-size:11pt\;font-family:Calibri\, sans-serif\;color:rgb(34\, 34\, 34)\;"><span style="font-family:times new roman\,serif\;"><span style="font-size:12pt\;">Please use caution when traveling near the work zone\;&nbsp\;<strong>watch for signage and flaggers</strong></span></span></li>\n</ul>\n<strong><u><span style="font-size:12pt\;">Pedestrians:</span></u></strong>\n\n<ul>\n	<li style="font-size:11pt\;font-family:Calibri\, sans-serif\;color:rgb(34\, 34\, 34)\;"><span style="font-family:times new roman\,serif\;"><span style="font-size:12pt\;">Sidewalks will be open through the project</span></span></li>\n</ul>\n
LOCATION:Mill Bay Road from Hemlock Street to Bartel Avenue
UID:e.2267.15719
SEQUENCE:3
DTSTAMP:20260629T083322Z
URL:https://business.kodiakchamber.org/events/details/project-mill-bay-road-rebuild-09-10-2024-15719
END:VEVENT

END:VCALENDAR
